EESemi.com Forum Archives
Ultrasonic Cleaning Prior to Reliability Stressing
The
preconditioning step (SHRT) done prior to
reliability testing of samples can sometimes subject the samples to
ionic contaminants. These contaminants can result in leakage and
other problems that might cause the reliability assessment activity to
fail. The archived forum thread below explores the feasibility of
performing ultrasonic cleaning after preconditioning to eliminate ionic
contaminants in the samples prior to reliability stressing. Note
that ultrasonic cleaning can be mechanically harmful to a device, so its
use as a cleaning step must be evaluated very carefully before it is
officially used.
Posted by Sook Fong:
Fri Jul 15, 2005 2:19 pm
Post subject: Ultrasonic Cleaning on BGAs prior to
reliability stressing |
|
I'm doing reliability
qualification on BGA parts. During preconditioning, some
ionic contamination may be introduced to the parts so we
perform Ultrasonic cleaning before any reliability
stress such as HAST, TC, THB, etc.
1. Does anyone out there have the same practise?
If yes,
2. What is the solution use? Or just DI water?
3. What is the solution temperature?
4. How long is the cleaning duration set?
5. In an interval test point of a humidity-related test
(such as THB), do you perform cleaning again?
6. If burn-in board is used, do you clean the boards as
well?
Thanks in advance,
SF |
|
|
Posted by Grant: Fri
Jul 15, 2005 9:20 pm Post
subject: |
|
We also suffer this problem
especially in HAST and PCT.
The contamination will impact the contact of FT.
To some leakage and shortage failures, the ultrasonic
cleaning is not a bad choice. But to the open failures.
It brings little help.
I want to know what type of failures did you meet? |
|
|
Posted by Guest: Mon
Jul 25, 2005 12:13 pm Post
subject: |
|
Hi Grant,
In THB, I see dendrite growth between traces in the
substrate. My FA Engr thinks it is due to contamination
or condensation as it grows in spots (looks similar to
delam spot on a PCB). It gave me leakages & shortage. No
opens. I have some pictures if you're interested to see.
I've contacted some experts who advised to clean after
precon but not during moisture tests interval. How do
you do it?
1. What is the solution use? Or just DI water?
(I found a solution from Alconox)
2. What is the solution temperature?
I think at room temp. The higher the temp, the stronger
(reads more damaging) the cleaning is.
3. How long is the cleaning duration set?
I think 5 minutes
Your thought?
Thanks,
SF |
|
|
Posted by Grant: Thu
Jul 28, 2005 10:04 pm Post
subject: |
|
Thanks!
We are now doing a experiment on cleaning after precon
and before PCT to see the performance.
Hope it will useful and enough to solve this issue! |
|
Back to the 'Best of Forums' Archives
HOME
Copyright
©
2008
EESemi.com.
All Rights Reserved. |
|
|